28 June 2023
Finishings of the premises continued during the month of June with air conditioning as well as water and electricity being installed and plastering and tiling being done on Level 4. Aluminium was installed on Level 2, while Level 3 saw several works being done, including plastering, and tiling as well as aluminium installation. During this month, furniture started being installed on Level 1.